Coordinated Audit Reports
Joint report on measures taken in poverty alleviantion
01. 01. 1970.
Joint Study on the coordinated audit of the Graduates’ Career Tracking Systems
01. 01. 1970.
Report on Auditing Investments of TEN-T Priority Project 6
01. 01. 1970.
Report on the Audit of the Management and Control Systems of the EU Structural Funds
01. 01. 1970.
Report on the audit on environment and nature protection in the border area to Austria and Slovenia in 4 languages
01. 01. 1970.
Report on auditing the flood control preparedness in the Upper Tisza region
01. 01. 1970.
Report of the parallel audit in the Switzerland and Hungary
01. 01. 1970.
Report on the audit on the protection of nature in Region Lake Neusiedl/Fertő
01. 01. 1970.
Audit report on railway construction Zalalövő–Bajánsenye–Hodoš–Murska Sobota
01. 01. 1970.
Report on the audit of the investment project Mária Valéria bridge
01. 01. 1970.